Saturday, October 22, 2011

Getting Anxious!

Today we spent the day just admiring all the advancements and customization in the house. We're getting so close, and getting extremely anxious to move in (hopefully by the end of November...hopefully). Here's where we're at...

Cabinets were delivered


Starting to install cabinets



A lot more to be installed







Staining the den doors



Dining Room
.
Dining Room




Railing upstairs


Railing





Painted Fireplace



Things are kinda messy






Tile in the Master Bath





Master Bath Shower

Tile in guest bath

Address Stone - LOVE IT!




Stone on the front of the house








Outside is almost complete!

Thursday, September 22, 2011

Special Delivery

Drywall is still coming along, but lots of materials were dropped off at the house this week. Brick, stone, and more insulation for the garage. Who insulates a garage? I asked the same thing - but apparently we do.

I think these images illustrate the layout of the house. Yes, it took me this long to finally determine what our house would look like. As I mentioned before - I don't follow blueprints very well.

With this week winding down, here is where we landed.....

The entry-way


Looking into the kitchen area





My favorite window



Tub in the Master Bath


Stone for the outside



Our front lawn right now. Looks like a dumping ground




Outer Brick


Our HOME!

Sunday, September 18, 2011

It's Been Awhile...

It's been over a month since I last blogged about the house and a lot has changed. Mostly behind the scenes work like electrical, plumbing, insulation...all of these things are rather boring to me. I am just anxiously awaiting something I can DECORATE!

I know all these little pieces are part of the larger puzzle, so here is how our puzzle is fitting together...
Hopefully more to come soon - brick is next on the list.

              WINDOWS








DRYWALL



Doing an inspection



Sunday, August 14, 2011

Fast Frame-Work

Over the past 2 weeks our entire house has been framed and all the walls are roughed in. This is great for me...I can finally begin to visualize what this house will look like. It's so difficult (for me anyway) to look a blueprint and determine how something comes to life.

I'm glad things seem to be shaping up well, because there isn't much I could possibly do about the design or layout now...the foundation is done, and walls are up - so this is it. I have to admit, I relayed heavily on Bob and his reassurance that I would love the layout...and I do.

Here are some pictures of how things have really developed over the past few weeks....


WEEK ONE:
* Click on the pictures to enlarge for better viewing


Our first set of walls!



The first floor - from the ground up


He wasn't too happy that I made him pose.



Rain doesn't stop us from visiting daily

Front of the house


Hanging Out  :)

View from the family room into the kitchen






This will be the door wall that leads out to the pool. 
Bob doest know this yet ;)



Looking out the Kitchen window



WEEK TWO:
* Click on the pictures to enlarge for better viewing

2nd Floor - in production


Happy with the work!
Bob + Carla
View from downstairs


My Mom & Bestie
Hope to have a roof soon so umbrellas aren't necessary when visiting.



Besties for 28 years


Windows in bedroom #4

Where do we put the pool table?


Back of the house - still need a few more walls here

Front view

Up-staris bedrooms



The crane is coming tomorrow to lift the final walls and construct the roof. 
Stay tuned for more pictures.

Thanks for stopping by!!

-xoxo-