Sunday, August 14, 2011

Fast Frame-Work

Over the past 2 weeks our entire house has been framed and all the walls are roughed in. This is great for me...I can finally begin to visualize what this house will look like. It's so difficult (for me anyway) to look a blueprint and determine how something comes to life.

I'm glad things seem to be shaping up well, because there isn't much I could possibly do about the design or layout now...the foundation is done, and walls are up - so this is it. I have to admit, I relayed heavily on Bob and his reassurance that I would love the layout...and I do.

Here are some pictures of how things have really developed over the past few weeks....


WEEK ONE:
* Click on the pictures to enlarge for better viewing


Our first set of walls!



The first floor - from the ground up


He wasn't too happy that I made him pose.



Rain doesn't stop us from visiting daily

Front of the house


Hanging Out  :)

View from the family room into the kitchen






This will be the door wall that leads out to the pool. 
Bob doest know this yet ;)



Looking out the Kitchen window



WEEK TWO:
* Click on the pictures to enlarge for better viewing

2nd Floor - in production


Happy with the work!
Bob + Carla
View from downstairs


My Mom & Bestie
Hope to have a roof soon so umbrellas aren't necessary when visiting.



Besties for 28 years


Windows in bedroom #4

Where do we put the pool table?


Back of the house - still need a few more walls here

Front view

Up-staris bedrooms



The crane is coming tomorrow to lift the final walls and construct the roof. 
Stay tuned for more pictures.